The library is entering the next phase of construction. Some library offices have been moved from the east side of the main floor to the west side: Curriculum, Interlibrary Loan, and University Special Collections & Archives remain the the second floor. The print collections remain on the second floor as well. 

The new entrance is located on the west side of the building, this is a permanent entrance. 

West Entrance